100% financing is available.

- Term up to 15 years
- Inquire if special deal offers are available for this pool model
- "Daydream" kit starts at $201.12 per month
- Fully built Daydream starts at $409.41 per month

Daydream

Barrier Reef

Daydream - 14' x 40' x 3'10"-6'3"

Daydream model is a three in one combination that include swimming pool, spa and tanning ledge. The pool section has deep end entry and swim out bench. The shallow end has side to side sitting area and curvilinear side entry steps.

Standard Features

  • Color of your choice
  • Pool pump (3 years warranty)
  • 200+ sq.ft. cartridge filter (3 years warranty)
  • In-line sanitation system
  • Equipment pad
  • Skimmer kit
  • Returns
  • Main drain kit
  • Vacuum pole
  • Vacuum hose
  • Vacuum head
  • Brush
  • Leaf net

Optional Features

  • LED Lights - 6-colors low voltage
  • Lights remote control
  • Variable speed Pump
  • Heat pump (3 years warranty)
  • Gas heater (3 years warranty)
  • Salt sanitation system (3 years warranty)
  • Mineral sanitation system (Frog by Kings Technologies)
  • Pool safety cover

Available Pool Packages

Daydream fiberglass pool model can be ordered as the following package:
SPN is responsible for
  • Pool shell will be delivered to the project site or picked up from the factory by the homeowner
Homeowner is responsible for
  • Pool equipment
  • Pool plumbing supplies
  • Pool handling machinery
  • Excavation machinery & services
  • Backfill material
  • Excavation
  • Installation & plumbing
  • Dirt removal
  • Pool equipment assembling
  • Electrical work
  • Pool deck construction
SPN is responsible for
  • Pool shell will be delivered to the project site or picked up from the factory by the homeowner
  • Plumbing kit will be delivered to the project site or picked up from the local supply house
  • Pool equipment will be delivered to the project site or picked up from the local supply house
Homeowner is responsible for
  • Pool handling machinery
  • Excavation machinery & services
  • Backfill material
  • Excavation
  • Installation & plumbing
  • Dirt removal
  • Pool equipment assembling
  • Electrical work
  • Pool deck construction
SPN is responsible for
  • Pool shell will be delivered to the project site or picked up from the factory by the homeowner
  • Plumbing kit will be delivered to the project site or picked up from the local supply house
  • Pool equipment will be delivered to the project site or picked up from the local supply house
  • Authorized pool technician to supervise installation process
  • Optional - installation helper
Homeowner is responsible for
  • Pool handling machinery
  • Excavation machinery & services
  • Backfill material
  • Excavation
  • Installation labor force
  • Dirt removal
  • Pool equipment assembling
  • Electrical work
  • Pool deck construction
SPN is responsible for
  • Pool kit delivery
  • Pool handling machinery
  • Excavation machinery & services
  • Dirt removal and disposal
  • Backfill material
  • Authorized pool installation
  • Pool equipment assembling
  • Standard grading 3ft around the pool
Homeowner is responsible for
  • Electrical work
  • Pool deck construction
SPN is responsible for
  • Assistance with engineering and township permits
  • Pool kit delivery
  • Pool handling machinery
  • Excavation machinery & services
  • Dirt removal and disposal
  • Authorized pool installation
  • Standard 3ft grading around the pool
  • Electrical
  • Pool deck construction

You can always request for a customized package to fit your budget!

Request MORE Information Now

Choose desired package


Request MORE Information